All installation and renovation accessories are available from The Wooden Floor Specialists Ltd.
For details please contact us.

 

Check that the subfloor is sufficiently level using a long board.
If protection against moisture is required, lay plastic sheeting . Lay the underlay .
Begin laying in a left-hand corner, with wedges between the boards and the wall,
and with the tongues facing into the room. Use string to check that the row is correctly aligned.
Start the second row with the piece left over from the first row. Leave at least 50 cm between end joints . Apply glue along the whole of the upper side of the groove on the long and short sides of the board.
Tap the boards together immediately using a hammer and a tapping block. If the board is at the end of a row, knock together the end joints with a heel iron and wedge firmly in place.
Fit the skirtings and mouldings. You're ready to move in!